Commissioning & After-sales Support.

Engineers on site from installation to steady operation, and available when the plant needs them.

From Installation to Steady Operation.

  1. Installation Supervision

    Foundations, alignment, piping connections and installation checked against vendor requirements.

  2. Pre-commissioning

    Mechanical completion checks, flushing and leak-test coordination, readiness punch lists.

  3. Cold and Hot Commissioning

    Start-up of equipment and systems with the vendor and your operators.

  4. SAT Coordination

    Site acceptance tests planned and coordinated with vendor and client.

  5. Troubleshooting

    Diagnosing performance problems, leaks, vibration and control issues.

  6. Maintenance & Spares

    Recommended spares, maintenance support and critical parts before the next outage.

Penta coordinates inspection and testing with vendors and accredited bodies; it is not itself a statutory inspection body or calibration laboratory.

Service request

Tell Us What’s Happening on Site.

Helpful to have ready

  • Equipment type, make, model and serial number
  • Operating conditions: medium, pressure, temperature, flow
  • What changed and when the problem started
  • Alarm logs, readings, photos or videos

Plant down? Call +880 1852 508423 as well as sending this form.

Contact

Include the country code if outside Bangladesh.

Equipment & site

Symptoms, when it started, what has been tried, current operating conditions.

Attachments (optional)

or drag them here

Up to 5 files, 10 MB each, 20 MB in total. PDF, DWG, DXF, XLS, XLSX, DOC, DOCX, JPG, JPEG, PNG.

    * Required